7 Common Mistakes When Choosing a Flexo Printing Machine in Europe (And How to Avoid Them)

Choosing a flexo printing machine is a long-term investment.
However, many European buyers face unexpected costs, delays, or performance issues — not because of the machine itself, but because of wrong selection decisions.

This guide highlights the most common mistakes we see in real projects, and explains how to avoid them before signing a contract.

Get Free Flexo Machine Selection Checklist

Why Many Buyers Make the Same Selection Mistakes

  • Decisions based on price instead of production data

  • Limited understanding of automation impact

  • Underestimating CE and compliance requirements

  • Overlooking future expansion needs

Most mistakes happen before technical discussions start.
Once the wrong configuration is delivered, correcting it becomes expensive and time-consuming.

Mistake #1: Choosing Based on Machine Price Alone

A lower purchase price often hides higher operating costs.
Labor, setup time, waste, and missed orders can easily exceed the initial price difference within the first year.

How to Avoid

  • Evaluate total cost of ownership

  • Compare productivity, not just price

Mistake #2: Ignoring the Right Automation Level

Some factories invest in full automation without enough job volume.
Others choose manual machines and struggle with frequent order changes.

How to Avoid

  • Analyze order frequency and batch size

  • Match automation level to real production needs

Mistake #3: Underestimating Job Changeover Time

In Europe, where short-run and mixed orders are common, setup time directly limits daily capacity.

Real Impact

  • 30 minutes per changeover × 10 jobs/day = 5 hours lost

  • Reduced ability to accept urgent orders

How to Avoid

  • Choose machines with job memory and assisted setup

  • Consider automation ROI, not just speed rating

Mistake #4: Misunderstanding CE Certification Requirements

Some buyers assume CE applies only to components or can be handled after shipment.
In reality, CE compliance is mandatory before installation.

Risks

  • Customs clearance delays

  • Additional engineering costs

  • Legal liability for importers

Mistake #5: Not Planning for Future Expansion

Production volume and order structure often change within 2–3 years.
Machines without upgrade paths can limit growth.

How to Avoid

  • Choose modular automation designs

  • Confirm upgrade options in advance

Mistake #6: Overlooking After-Sales and Technical Support

Fast delivery means little if installation, training, or troubleshooting support is missing.

How to Avoid

  • Confirm installation and training scope

  • Understand spare parts availability

  • Ask about remote diagnostics

Mistake #7: Making Decisions Without Real Comparison

Relying on brochures alone often leads to unrealistic expectations.

How to Avoid

  • Compare multiple configurations

  • Review real customer cases

  • Request production demonstrations

Flexo Printing Machine Selection – FAQ

Q1: What is the most expensive mistake?
A: Choosing the wrong automation level for your order structure.

Q2: Can mistakes be corrected after installation?
A: Some can, but most corrections are costly compared to proper selection upfront.

Avoid Costly Mistakes Before You Invest

Our engineers help European packaging factories review production data and recommend the right machine configuration — before problems occur.

More than 40+Years Experience of Professional flexible printer, corrugated machinery and cardboard machinery manufacturer.

Contact

Add:No.16 Fenghuang rd,Pinghu Longgang,Shenzhen,China.

Tel: 0086-84676777  84676382
Mob:0086-13926567411(whatsapp)

Email: info@szkofa.com

© 2025 KOFA Machinery. All Rights Reserved. | Design by Beboss | Sitemap

Contact Us